Technical Description |
Hydro-Fracturing
Process
Hydro-Fracturing is process
by which water is forced into an existing bore
well to pressurise, open out and clean out of
non-water producing veins in the earth strata
thereby opening a clear path of water to flow
into the well increasing the overall water
yield.
Principles of
Hydro-fracturing
•The Pascal
Law states that, when hydraulic pressure is
applied in
any closed
body, it acts in all directions and is equal in
all points.
•Therefore when the
high-pressure water is injected in the
isolated
section of
the bore-well, the hydraulic pressure acting is
equal.
• The injected water flows
in the least resistance path
and
therefore the
inter-section of fractures or opening of the
fractures
takes place
in the weakest zone.
Hydro-fracturing process
stimulates hydro-geological conditions of a
bore-well as follows.
•
Initiation and propagation of new fractures.
• The existing drainage channels
accumulated by clay are cleaned.
•
The pre-existing fractures are widened and
smoothened.
• Improves smooth and
free flow to and within the conduit system. In a
typical dry/low yielding bore well the
water borne Fracture
zones are identified and are subjected to high
pressure water pumping to initiate,
propagate, widen and
extend the existing fractures. The water pumped
in the bore well under high
pressure up to 3000 PSI
(Pounds per Sq. inch)
breaks up fissures, fractures, cracks and
cleansaway
mud and ther impurities,
blockages and leads to contact with adjacent
Water bearing fractures and bodies,
there by improving
theover all yield as the fractures
are exposed to larger and extensiveconduit
system of fractures /
aquifers.
Hydro-Fracturing is
also the most effective tool for ground water
recharging.
A typical
Hydro-fracturing process / Methodology adopted
by our company for an assured
success
Initially general
hydro-geological survey of the area of the
selected bore well is conducted.
1.
Identification of Fractures / Fracture Zone in
the selected bore-well by
drillers log, down-hole
video inspection or by
geo-physical logging.
2. Pre-yield pumping
test.
3. Hydro-fracturing.
4. Post-yield
pumping test.
Identification of
Fractures
Driller’s logs and
Geo-physical logging is sufficient to identify
the fractures. However, by video inspection
through down-hole TV camera it can be determined
for
• The present condition &
actual depth of the bore-well.
•
The number of fractures present and its
disposition.
• The location of
clean/even surfaces available for packer
setting.
Pre-yield pumping
test
With a suitable submersible
pump the present actual yield of the selected
bore well is determined. Details like drawdown
and recovery of static water level is tabulated
using electronic water level indicator.
Hydro-fracturing
The process involves two steps
namely Packer setting and high-pressure water
pumping.
Packer / Packer
setting
• Packer is a tool,
which can be inflated and deflated
hydraulically.
• A single or dual
Packer may be chosen.
• This
packer seals the bore-well but allows water to
be pumped through a pipe
passing through the
packer.
•
The packer is inflated hydraulically to seal the
bore-well at the desired depth
of fracture zone already
determined by video
inspection.
• The packer is
generally set at 20 to 30 feet below the casing
pipe or 70 to 80 feet from the
ground level (to avoid
weathered zone if, the depth
of the casing pipe is less).
• Dual packers are used to affect
and develop only the desired fracture
zones chosen. Here two packers
are spaced at the
desired distance apart to
isolate certain segments of the identified
fracture zones and water
is injected only between these two packers.
High Pressure water
pumping
• This is carried
out through a high pressure Hydro-frac pump
capable of generating up to
3000 PSI (Pounds per
square inch).
• Water of approx.
1500 gallons is pumped into the bore-well
(through the packer piping),
thus forcing the water
into existing fractures at a rate
faster than the fracture can
accept it, there by opening and
clearing the
fracture paths.
• When the water is expended, the
packer is dropped to a further depth
of 70 to 80 feet and the
process is repeated.
• Depending upon the depth of the
bore-well, normally three
Hydro fracturing setting
are carried out for assured result.
Post-yield pumping Test
• Is similar to pre-yield pumping
test. A flow test is recorded to determine
the overall improvement of the
yield.
•
Average Hydro-Fracturing Operational time is 3
to 4 Hours per
Bore-well.
JCR DRILLSOL’ Hydro-Fracturing
Unit
`JCR DRILLSOL model JCR HFU-1’
is a truck mounted Well Rehabilitation Unit
designed for Hydro-fracturing of low yield
bore-wells of 6 and 6½-inch diameter in hard
rock formations. It also consists of yield test
pumping unit with necessary instruments and
tools.
Features available only
in Frac-Tech model MAXFT-1
JCR
HFU-1 is Hydraulically driven Hydro-Fracturing
Unit operated through a transfer gearbox
assembly thus eliminating an additional prime
mover, space, weight and cost.
Availability of Down Hole TV Camera to
identify visually the fracture zones of best
result and to prevent blind entry into the
unknown bore-well and dangerous setting of
packer. Also, exact depth & distortion of
casing pipe, static water level and bore-well
depth are visualised thus eliminating any
erroneous drillers log and geo-physical logging.
A separate Flow control valve is
provided to engage/disengage the high pressure
Hydro-frac pump ‘alone’ from the hydraulic
circuit during any wrong / dangerous setting of
packer.
Our basic
Hydro-fracturing Unit Model `JCR HFU-1’ includes
• A Base Frame with
built-in lockable storage facility for Frac
pipes, Packers,
submersible pumps and tools etc
•
High-pressure hydro-frac pump driven
hydraulically.
• 2HP Engine driven
super charge (Booster) pump or Hydraulic
hand pump.
• Hydraulic Power Pack.
• Hydraulically operated Winch.
• Hydraulically operated Crane.
• Hydraulic leveling jacks. 4 NOS
• Hose and Cable reels.
• Well head Assembly.
• Centralized Hydraulic controls
with gauges.
• Diesel Generator
7.5 KVA.
• Submersible pump (3
H.P., 28stage).
• Truck for
mounting .AL Cargo 100.12
• Night
Lights
Essential tools and
Accessories
• Down Hole
Camera with B/W TV monitor.
•
Hydraulic packers 6 inch dia – Single.
• Frac- Pipes of required
quantity.
• Hydraulic inflate hose
of required length.
• Electrical
cable reel of required length.
•
Required adapters, couplings, handling tools,
protective gear and manuals
etc..
Description of Main
Components
High Pressure
Hydro-frac Pump
Type: Two speed
hydraulically driven with dual functions, break
and develop. In break function the pump operates
in low speed producing over 2500 PSI at 40 GPM,
which is the pressure for fracturing. In well
developing function the pump operates at high
speed producing 500 PSI at 80 GPM, which
develops the well allowing for optimal water
flow
Hydraulic system Working Pressure: 3000
PSI
Crane
8 ton
capacity, Hydraulically operated with manual
Extension
Winch
1
Ton capacity, Hydraulically operated
Spooling capacity: 30mts / Wire rope: 13mm
Hydraulic Power Pack
Truck driven consisting Transfer gear box,
Hydraulic Pump, relief valves, suction/return
line filters and reservoir.
Hydraulic Hand Pump
Type / Application: Dual Displacement /
Packer inflation
Working pressure: 700 bar
Super Charge (Booster) Pump
HP capacity Self-priming, engine
driven with positive displacement.
Carrier
Required
Engine Capacity: 110 BHP
Recommended: Ashok
Leyland `Cargo’ Model: 100.12
Packer
Type: Single
- Hydraulic / Diameter: 6 inches
Accessories: Rubber seals, Adapters,
couplings etc.. of required sizes.
Frac Pipes
Type:
Seamless of standard 15 feet length
Diameter: 1 ½ inch nominal
Working
pressure: Tested & certified for 3000 PSI
Inflate Hose
Diameter: ¼ inch / Working Pressure: 700 bar
Down Hole TV Camera
Type: Video camera, water proof up to 500
feet.
Accessories: B/W TV monitor, Stand,
Connectors and winch.
Generator
Type: Air
cooled, Three phase, 415 VAC / Capacity: 7.5 KVA
Submersible pump 3 HP,
3-phase with electrical cable, control panel and
dry run preventor. |
|
| Send Mail |
|
| |
|
|
| |
Hydro Fractering Unit |
 |
| |
|
| |
|
|
 |
| |
|
|
Our Presence in : Afghanistan, Albania, Algeria, American, Andorra, Angola, Anguilla, Antarctica, Antigua, Barbuda, Antilles, Netherlands, Arabia, Saudi, Argentina, Armenia, Aruba, Australia, Azerbaijan, Bahrain, Bangladesh, Barbados, Belgium, Belize, Benin, Bermuda, Bhutan, Bolivia, Bosnia, Herzegovina, Botswana, Brazil,Brunei Darussalam, Bulgaria, Burkina Faso, Burundi, Cambodia, Cameroon, Canada, Cape Verde, Caribbean, Central America, Chad, Chile, China, Colombia Comoros, Congo, Costa Rica, Cote D'Ivoire, Croatia, Cuba, Cyprus, Czech Republic,Denmark, Djibouti, Dominica, Dominican Republic, East Timor, Ecuador, Egypt, El Salvador, Equatorial Guinea, Eritrea, Estonia, Ethiopia,Finland, France, French Guiana, French Polynesia, Gabon Gambia, the Georgia, Germany, Ghana, Gibraltar, Greece, Greenland, Grenada, Guadeloupe, Guam, Guatemala, Guernsey and Alderney Guiana, French, Guinea, Guinea-Bissau, Guinea, Equatorial, Guyana, Haiti, Vatican, Netherlands, Hong Kong, China, Hungary, Iceland, India, Indonesia, Iran, Iraq, Ireland, Israel, Italy, Ivory Coast, Jamaica, Japan, Jersey, Jordan, Kazakhstan, Kenya, Kiribati, Korea, Kosovo, Kuwait, Kyrgyzstan, Latvia, Lebanon, Lesotho, Liberia, Liechtenstein, Lithuania, Luxembourg, Macedonia, Madagascar, Malawi, Malaysia, Mali, Malta, Martinique, Mauritius, Mayotte, Mexico, Micronesia, Mongolia, Montenegro, Montserrat, Morocco, Mozambique, Myanmar (ex-Burma), Namibia, Nauru, Nepal, Netherlands, Netherlands Antilles, New Caledonia New Zealand, Nicaragua, Niger, Nigeria, Niue, North America, Norway, Oceania, Oman, Pakistan, Palau, Palestinian, Panama, Papua New Guinea Paraguay, Peru, Philippines, Poland, Portugal, Puerto Rico, Qatar, Reunion, Romania, Russia, Rwanda, Sahara, Saint Barthelemy, Saint Helena, Saint Kitts and Nevis, Saint Lucia, Saint Martin, Saint Pierre and Miquelon, S Vincent and Grenadines, Samoa, San Marino, Sao Tome and Principe, Saudi Arabia, Senegal, Serbia, Seychelles, Sierra Leone, Singapore, Slovakia, Somalia, South Africa, South America, Spain, Sri Lanka, Sudan, Suriname, Swaziland, Sweden, Switzerland, Taiwan, Tajikistan, Tanzania, Thailand, Timor-Leste, Togo, Tokelau, Tonga, Trinidad & Tobago, Tunisia Turkey, Turkmenistan, Tuvalu, Uganda, Ukraine, United Arab Emirates, United Kingdom, Uruguay, Uzbekistan, Vanuatu, Vatican, Venezuela, Viet Nam Virgin Islands, British, Virgin Islands, U.S., Wallis and Futuna, Western Sahara, Yemen, Zambia, Zimbabwe |
 |
| Terms & Conditions - Disclaimer Copyright © 2009 dthrotarydrilling.com All rights reserved. |
|
|
|
|